Project at the Sidul factory, a case study in Industrial Engineering

projetos industriais tdgi

With the aim of expanding and modernising the sugar transport line, TDGI successfully carried out the Engineering and Installation services contract at the Sidul Açúcares factory, the largest sugar refinery in Portugal and part of the ASR International, Inc. Group. The project included the supply, assembly and installation of a set of systems designed to increase the efficiency, quality, hygiene and safety of the manufacturing process, and TDGI also carried out the study, design and execution of the engineering detail for the new line.

With huge challenges in terms of planning and execution, the project was carried out in two years and fully met Sidul’s operational needs and requirements.

The video with the technical description of the project, including testimonials from the Client, can be viewed below.